Outsourcing operation and maintenance manuals
Contents |
[edit] What is an O&M manual?
Operation and maintenance manuals [O&Ms] provide the information required by end users for the operation, maintenance, decommissioning and demolition of a building. The format and content are typically defined in the Employers Information Requirements [EIRs] of the contact preliminaries documents; typically, under clause A37.
The following is standard content that should be provided in an O&M manual:
- Details of building construction e.g. finishes, cladding, doors
- Requirements for demolition, decommissioning and disposal
- Asset register of plant and equipment
- Manufacturer’s instructions for efficient and proper operation
- Commissioning and testing results
- Guarantees, warranties and certificates
- As-built drawings and specifications
[edit] Why are O&Ms a challenge for contractors?
O&Ms are a prerequisite for practical completion, yet the resource and time required to gather all relevant information is often underestimated or left too late. As a result, clients become disappointed with poor quality O&Ms at handover and will postpone sign off if they deem the O&M Manuals incomplete.
This reflects badly on the contractor and prevents valuable site staff from moving on to future projects as they rectify any problems. This also has a knock on effect for building managers and facilities maintenance teams who are unable to maintain their building efficiently and safely.
[edit] Outsourcing O&Ms
Contractors can produce manuals in house but this may be a distraction from the core task of construction. The cost of outsourcing O&Ms to a specialist provider can be an initial deterrent, particularly if it’s not budgeted for it in the cost plan, but, there are many advantages:
- It eliminates stress at practical completion.
- There may be fewer aftercare calls.
- It ensures there is a realistic budget for O&Ms in cost plans.
The service should Include:
- An agreed process for delivery.
- Chasing and collating project data.
- Structured site review process.
- Handover at practical completion.
- Aftercare hosting and client training.
[edit] What to look for in an O&M specialist
Outsourcing O&Ms should be done as early as practically possible. This enables the specialist provider to follow the construction plan and manage trades as and when they arrive on site.
Key questions to ask any potential provider include:
- Is project handover documentation the sole focus of the company? If not, why not?
- Do they have the relevant experience, skills and resources to handle the project?
- Is the service priced on the amount of work done? If it’s a percentage of construction value, question the relevance of this.
- Is a total management role offered including; site visits, a structured review process, visibility of project progress and so on?
- Can they integrate O&M and asset data with client systems?
- Do they provide an asset register of major plant items as standard?
A specialist provider should outline a fixed, managed process that underpins the way they deliver every project to ensure quality and consistency. This is a total management service to control the flow of information in accordance with your construction programme. It is best achieved through early appointment; chasing all subcontractors, designers and suppliers for information as and when they start on site.
--Createmaster 16:58, 12 Jun 2017 (BST)
[edit] Related articles on Designing Buildings Wiki
- Building log book.
- Building owner's manual - O and M manual.
- Building user's guide.
- Handover to client.
- Health and safety file.
- Maintenance.
- Operation and Maintenance Manuals - Cheap Options.
- Operation, maintenance and training (OMT).
- Practical completion.
- Preliminaries.
- Technical guide.
- Tender documentation.
- Why hard copies of O&M manuals are obsolete.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.